Project Green. An integrated green methanol Export platform delivering green methanol to the World.

AHFL is developing Project Green as an integrated green methanol production and export platform, bringing together renewable power, green hydrogen production, methanol synthesis and export infrastructure within a phased development strategy.

The project is designed to support the transition to lower-carbon fuels, create long-term industrial value in Nigeria and connect locally produced green methanol with international markets.

Project status

Key resources secured.
Engineering comes next.

Land, water and the transmission line are secured. The next step for Project Green is to begin Pre-FEED.

Updated

Key resources in place

  • Land

    Project site secured

    Secured
  • Water

    Water secured for the project

    Secured
  • Transmission line

    Transmission line secured

    Secured
Next step

Project Green

Starting
Pre-FEED

The next stage of project definition and engineering.

Development roadmap

Every milestone.
A step forward.

From the first studies to a platform designed to grow, explore the proposed development journey for Project Green.

Follow the timeline as you scroll

Indicative development schedule. Dates describe the proposed roadmap and do not confirm completion. Timing and capacities remain subject to studies, approvals, financing and final investment decisions.

  1. 2024 – 2025

    Studies, partnerships & FEED

    Define the opportunity.

    Establish the technical and commercial foundation: project studies and partner engagement. This work defines the proposed system and the assumptions that later decisions depend on.

    PROPOSED OUTCOMEA defined development basis

  2. 2026 – 2027

    Final investment decision

    Commit to the next chapter.

    Bring engineering, financing and commercial arrangements together for a final investment decision (FID). Progression depends on the required approvals and the project meeting the conditions for investment.

    PROPOSED OUTCOMEAn investment decision, informed by due diligence

  3. 2027 – 2030

    Phase 1 construction · Akwa Ibom

    Turn the plan into a place.

    The projected first construction phase brings the integrated energy and methanol facilities into physical form in Akwa Ibom, alongside the infrastructure required to connect the production pathway.

    PROPOSED OUTCOMEPhase 1 facilities prepared for commissioning

  4. 2030

    Phase 1 commercial operations

    Begin a new energy journey.

    The roadmap targets the start of commercial operations for Phase 1, following commissioning and the necessary operational readiness checks. This is the transition from developing the project to producing and supplying product.

    PROPOSED OUTCOMEA proposed first stage of commercial production

  5. 2030 – 2032

    Phase 2 expansion · Benue

    Extend the opportunity.

    The proposed second phase extends the platform to Benue. Its scope and timing depend on further engineering, infrastructure planning, approvals and financing, informed by the development of Phase 1.

    PROPOSED OUTCOMEA second location within a connected platform

  6. 2032+

    Long-term scale

    Build for a wider horizon.

    The longer-term roadmap envisages growth towards 1.2 million metric tonnes per year of methanol capacity. This is a projected ambition for the platform, subject to the development and funding of future phases.

    PROPOSED OUTCOMEA scalable platform for African growth

An informed conversation

Explore the project
with us.

Contact AHFL to discuss the proposed platform and request the latest available project information.